HomeProject Explore

Project Explore

Nov-10
Nipisi Pipeline Spread B

Nipisi Pipeline Spread B - 98 km of NPS 24 incl. 10 HDD water crossings

View Project
Nov-11
Wood Buffalo Pipeline

Wood Buffalo Pipeline - 57.7 km of NPS 30, 3 HDD, guided slip bore under Highway 63

View Project
Oct-12
Canterra Road Replacement

Canterra Road Replacement -Replacement of the existing HDD crossing with a new crossing (400 m of NPS 24)

View Project
Nov-12
Norealis Pipeline

Norealis Pipeline - 107.4 km of NPS 24 Pipeline

View Project
Aug-13
TUC Pre-Build 15 km

TUC Pre-Build 15 km of NPS 36" that runs through the Transportation / Utility Corridor

View Project
Pipeline Construction
Jun-14
Stonefell project

Stonefell project - 60 km of NPS 36" pipelines from the SE 1/4 of Sec. 35, TWP 57, Rge 20 to the SW 1/4 Sec....

View Project
Dec-14
Leismer Project

Leismer Project - 98.1 km of NPS 36" pipeline from SW 1/4 Sec. 8, TWP 84, Rge 6, adjacent to Enbridge Cheechum Terminal to the...

View Project
Jan-17
Tailings and Slurry Line Maintenance

Tailings and Slurry Line Maintenance plus misc Civil Projects

View Project
Nov-16
Remove 95 m segment

Remove 95 m segment from two recently abandoned 1.1 km pipeline segments; both 95 m segments are under the river (LSD 16-05-089-09 W4)

View Project
Back to Top