Canterra Road Replacement

Canterra Road Replacement -Replacement of the existing HDD crossing with a new crossing (400 m of NPS 24)

TUC Pre-Build 15 km

TUC Pre-Build 15 km of NPS 36″ that runs through the Transportation / Utility Corridor