Stonefell project – 60 km of NPS 36″ pipelines from the SE 1/4 of Sec. 35, TWP 57, Rge 20 to the SW 1/4 Sec. 31, TWP 53, Rge 22 – East side of Hwy 21
Stonefell project – 60 km of NPS 36″ pipelines from the SE 1/4 of Sec. 35, TWP 57, Rge 20 to the SW 1/4 Sec. 31, TWP 53, Rge 22 – East side of Hwy 21
Leismer Project – 98.1 km of NPS 36″ pipeline from SW 1/4 Sec. 8, TWP 84, Rge 6, adjacent to Enbridge Cheechum Terminal to the SW 1/4 Sec. 6, TWP 76, Rge 10
Tailings and Slurry Line Maintenance plus misc Civil Projects
Remove 95 m segment from two recently abandoned 1.1 km pipeline segments; both 95 m segments are under the river (LSD 16-05-089-09 W4)
Bear Canyon – Install approx. 26.3 km of NPS 36″ pipeline with a design pressure of 8450 kPa;
Boundary Lake -Install approx. 90.5 km of NPS 36″ mainline pipe and the related facilities specified
L3R – Spread 1 – Install of NPS 36″ approx. 144.6 km starting at Hardisty Terminal (KP 184.676) to KP 328.761.
Boundary Lake – Season 2 – Install approx. 32 km of NPS 36″ mainline pipe.
Trailings and Slurry Line Maintenance plus misc Civil Projects
L3R — Spread 2 – Install approx. 122.5 km of NPS 36″ pipe from KP 328.761